This technical assistance (TA) was primarily a follow-up on the recommendations of the risk analysis and risk mitigation study under the Phase 1 TA and was designed as an integral part of the preparation for development of a natural gas pipeline from Turkmenistan to off-take points in Afghanistan, Pakistan, and India.