Energy Supply Improvement Investment Program, Tranche 6 In December 2017, the Government of Uzbekistan and the Government of Afghanistan agreed to jointly develop a 500-kilovolt (kV) power interconnection from the Surkhan substation in Uzbekistan to the Khwaja-Alwan substation in Afghanistan.
Fostering Expanded Regional Electricity and Gas Interconnection and Trade under the CAREC Energy Strategy 2030 The knowledge and support technical assistance (TA) will support the implementation of the CAREC Energy Strategy 2030 in achieving its long-term vision of a reliable, sustainable, resilient, and reformed regional energy market by 2030.Â
Preparing the TAPI Gas Pipeline Project The project will considerably help improve regional energy trade, as it will build and support requisite natural gas supply and transportation capacity across the TAPI countries.
Regional Cooperation on Increasing Cross-Border Energy Trading within the Central Asian Power System – Expansion of Membership in Central Asian Power System (Subproject 3) The technical assistance (TA) will have the following outcome: regional energy trade and cooperation enhanced. The identified infrastructure projects, which are necessary for connection of Afghanistan, Turkmenistan and other potential new electricity markets to Central Asian Power System (CAPS), will be submitted for endorsement of the CAPS governments at Central Asia United Power System Council Meeting.
Preparing Sustainable Energy Projects in Central Asia The regional transaction TA facility will provide project preparation support to a series of ensuing projects in Central Asia: (i) Power Distribution Enhancement, Renewable Energy and Energy Efficiency Projects in the Kyrgyz Republic; and (ii) Power Sector Development Program in the Republic of Tajikistan.
Rural Electrification Project The Tajikistan Rural Electrification Project will finance the construction of electricity generation and distribution infrastructure to provide off-grid solutions or connect to the central grid vulnerable communities in Tajikistan’s eastern Gorno–Badakhshan Autonomous Oblast (GBAO) and southern Khatlon region.
Uch-Kurgan Hydropower Plant Modernization Project The proposed project will replace ageing electrical and mechanical equipment for power generation and transmission at the Uch-Kurgan hydropower plant (HPP) in the Naryn River cascade, and undertake silt and sedimentation removal which hinders the proper operation of hydromechanical equipment of the HPP.
Regional Cooperation on Increasing Cross-Border Energy Trading within the Central Asian Power System – Provision of Solutions to Bottlenecks to the Regional Power Trade (Subproject 2) This is the second subproject which is being launched simultaneously with the first subproject - Modernization of Coordinating Dispatch Center Energiya (CDC). The technical assistance subproject will have the following outcome: cross-border clean energy trade increased using high-level technology by CDC.
Regional Cooperation on Increasing Cross-Border Energy Trading within the Central Asian Power System – Modernization of Coordinating Dispatch Center Energiya (Subproject 1) The technical assistance (TA) subproject will have the following outcome: cross-border clean energy trade increased using high-level technology (HLT) by coordinating dispatch center (CDC) Energiya. The HLT will replace manual processes to allow CDC to operate in a real-time regime.
Regional Cooperation on Increasing Cross-Border Energy Trading within the Central Asian Power System The regional knowledge and support technical assistance (TA) cluster will support an increase in regional power trade among Afghanistan, Kazakhstan, the Kyrgyz Republic, Tajikistan, Uzbekistan, and Turkmenistan.
Reconnection to the Central Asian Power System Project The proposed project will (i) install modern relays, circuit breakers, instrumental transformers, and ancillary equipment and systems at eight 220kV and two 500-kilovolt (kV) interconnection points; (ii) establish two new 500-kV interconnections; and, (iii) provide capacity building to Barki Tojik staff in reliability of parallel operations.
National Power Grid Strengthening Project The project will (i) build about 1,100 kilometers (km) of new 110-kilovolt (kV), 220 kV, and 500 kV transmission lines; (ii) construct four new substations; and (iii) expand three existing substations.
Floating Solar Energy Development The proposed knowledge and support technical assistance aims to pilot test and build expertise on the emerging floating solar photovoltaic (FPV) technology to diversify the energy mix, increase energy security, and reduce greenhouse gas (GHG) emissions.
Green Energy Small and Medium-Sized Enterprises Development Project The technical assistance will identify, support, and promote scalable, private sector-led business models for provision of affordable and sustainable energy products and services for Tajikistan’s rural population.
Energy Efficiency Facility for Industrial Enterprises, Phase 3 Phase 3 of the project will continue to finance energy-saving investments in both large industrial enterprises and industrial SMEs, and support energy efficiency capacity development through targeted technical assistance.
District Heating Energy Efficiency Project The project development objective is to improve the efficiency and quality of heating and hot water services in selected cities within the territory of Uzbekistan.
Energy Access SMEs Development Project The project aims to scale up private sector engagement in energy access by improving the risk-return profile of private investment in energy access products and services.
Heat Supply Improvement Project The development objective of the project project for Kyrgyz Republic is to improve the efficiency and quality of heating in selected project areas.