Regional Cooperation on Increasing Cross-Border Energy Trading within the Central Asian Power System – Provision of Solutions to Bottlenecks to the Regional Power Trade (Subproject 2)
Summary
This is the second subproject which is being launched simultaneously with the first subproject - Modernization of Coordinating Dispatch Center Energiya (CDC). The technical assistance (TA) subproject will have the following outcome: cross-border clean energy trade increased using high-level technology by CDC. Specifically, the subproject 2 outcome will contribute to the cluster TA outcome indicators (a) at least 11,000 million kilowatt-hours trade within CAPS annually and (b) at least additional 5,587,560 tCO2 reduction in emission achieved.
Expected Outcome
Regional energy trade and cooperation enhanced
Expected Outputs
Solutions to the bottlenecks to regional power trade provided
Project Types
Technical Assistance
Funding
Funding Agency | Amount (USD millions) | Notes |
---|---|---|
Asian Development Bank | 1 | |
Regional Cooperation and Integration Fund | 0.5 | |
Total | 1.5 |
...